Negative

What happened in Surface section:
Difficulties passing 20″ CSG shoe through FMS. Engaged CRTi and pushed through.

What Was Planned

Run 20″ csg with FMS.

What Was Learned

Wrong placement of stop collar on 20″ CSG. Stop ring should be placed in the middle of the centralizer. With the stop collar in the middle, the centralizer will get slimmer when hitting an obsticle. With stop ring over and under, the centralizer could get wrapt/widen and cause problems down hole.

What Actions Are Required

Place stop rings in the middle of centralizers.